|
2 Maize Trail - A work in progress
2 Maize Trail 1 - 2 Maize Trail 2 - 2 Maize Trail 3 - 2 Maize Trail 4
5 June 2004
The house is taking shape.
The portal on the west elevation.
The dramatic 2-story entrance opens to the Jemez Mountain view..
The kitchen takes in the entire Sandia Mountain.
1 August 2004
The rear elevation
The front entrance. Windows are in and the outside is being prepped for stuccoing.
The west deck
Concrete Canales will add a Mediterranean look
Graceful arches open on each room. Richly colored beam will contrast against white plaster.
10 September 2004
The drywall has been installed
The exterior is ready for stucco
—TOP OF PAGE—
2 Maize Trail 1 - 2 Maize Trail 2 - 2 Maize Trail 3 - 2 Maize Trail 4
|