2 Maize Trail - A work in progress
2 Maize Trail 1 - 2 Maize Trail 2 - 2 Maize Trail 3 - 2 Maize Trail 4
6 October 2004
The tile is going in and the fireplace is finished.
The front doors are being installed.
The Kiva firepace in the master bedroom.
The first coat of stucco has been applied.
A developing thunderstorm over the mesas off to the west.
Construction was completed in November 2004. This Tuscan-inspired design stands out handsomely against the dramatic backdrop of Sandia Mountain.
The next page shows interior and exterior photos taken in 2006 of the completed home.