|
Click here to visit 5 Maize Trail 2 >
5 Maize Trail - A work in progress - Updated 11 May 2005

A special coating is being applied that gives the look and feel of lathe and plaster.

The tub enclosure for the guest bathroom.

Detail of the mosaic band that surrounds the tub enclosure.

The tiled ceiling and glass block windows in the guest bath.
5 Maize Trail - A work in progress - Updated 25 April 2005

5 Maize Trail - A work in progress - Updated 15 April 2005

The fireplace in the great room is taking shape.

The drywall is installed and the wood is being stained.
The first of 3 coats of stucco is just being applied. More photos soon.
5 Maize Trail - A work in progress - Updated 18 March 2005
The outside of the house is ready for stucco.

The outdoor fireplace is taking shape.

The outdoor fireplace looks out onto the Sandias and is located on the south portal with access from the great room, dinning area and the master bedroom.
5 Maize Trail - A work in progress - Updated 15 January 2005

The rear view of the home overlooks the mesas and Jemez Mountains.
8 February 2005

The roof is on and the windows and doors have been added.


A hand carved support in the entry.

The rear deck.

The rear deck with beveled window enclosure.
5 Maize Trail 2 >
—TOP OF PAGE—
|